天堂网在线最新版www中文网,国产精品熟女视频一区二区,97碰碰碰人妻视频无码,国产乱子影视频上线免费观看,久久国产福利播放

FAT

The sixteen days sea trial for MV XIN MAO YANG was completed on Aug 30, 2018

Share to:

The sixteen days sea trial for MV XIN MAO YANG was completed on Aug 30, 2018.

The 308000dwt Cruder Oil Tanker (Hull No.: T300K-76) built by COSCO Shipping Heavy Industry (Yangzhou) Co., Ltd for China Shipping Tanker Company Limited.

 Shanghai NSE supplied Main Switchboard /Emergency Switchboard /Group Starter Panel /Individual Starter Panel /Push Button Box for the vessel.