天堂网在线最新版www中文网,国产精品熟女视频一区二区,97碰碰碰人妻视频无码,国产乱子影视频上线免费观看,久久国产福利播放

FAT

The five days sea trial for MV XI PAN 3 was completed on Jun. 30,2015.

Share to:

The five days sea trial for MV XI PAN 3 was completed on Jun. 30, 2015. The 2,000m3 marine dredge NT2013-29 was built by NANTONG GANGZHA SHIPPING MANUFACTURING CO.,LTD. for CHANGJIANG WATERWAY ENGINEERING BUREAU.  Shanghai NSE supplied 690V MSB/440V MSB for the vessel.